Our projects in "Civil Engineering" category

Jordan Bluffs

Built on the site of an old steel mill, these apartment complexes required a unique grading effort to make the site functional.

Aderra Apartments

FOCUS provided full-service surveying and engineering of 11 phases of this project. The site is over 137+ acres and includes 700 lots on a very flat site.

Still Water Homes

FOCUS provided full-service surveying and engineering of 11 phases of this project. The site is over 137+ acres and includes 700 lots on a very flat site.

Clearstone Subdivision

The production homes that were completed for Hallmark Homes required quick turnaround times - one day per home - and simple, accurate plans. A Revit base was created for each home type and used for all future re-use plans, allowing for quick engineering and drafting. Through this process, structural engineering was able to complete within just a few hours. Working with our in-house CAD Services team, we were able to get the final product to the client within five business days.

Day Ranch Energy-Efficient Community

Day Ranch is Woodside Home’s energy-efficient community that offers quick access to Silicon Slopes, shopping centers, and outdoor recreation areas via Interstate 15 and Bangerter Highway. The extremely dense residential development features 487 townhomes and 34 single-family lots on approximately 48 acres.

Costa Vida Midvale Restaurant

FOCUS worked with Terramerica, the original owner of the site, to develop this location. Because the site is relatively steep, grading and accessibility were specific challenges to our design. Our services included boundary and topographical survey, preliminary and final plats, site civil engineering, landscape and irrigation design, and SWPPP preparation.

The Parc at Day Dairy

Through his earlier involvement with the project, Focus project manager Eric Winters was tasked with converting an existing site solution for a completely different type of construction. Focus worked through the grading design to provide changes to the parking lot, update sewer and storm drain systems, and provide ADA standards for accessible design to the new buildings. Existing utilities were redesigned for removal and reconstructed in new locations.

Madison Parkway Office Building

The office building is located on a busy corner of State Route 151 that was undergoing a significant amount of improvement. Focus Engineering & Surveying carried out site civil and structural engineering services in conjunction with the Utah Department of Transportation (UDOT) road widening and asphalt project.